Material Cost Calculator
Estimate material budgets from quantity and unit price.
Cost & Labor
Estimate hours from production rates and quantities.
Loading tool…
Educational US estimate only. Not engineering, structural, code, or professional construction advice. Mix designs, codes, and local conditions vary — verify with licensed professionals and your building department.
BuildToolsHub takeoffs separate net measured quantities from ordered quantities. Ordered qty = net × condition-based waste, then rounded for plant or package sizes (e.g. ready-mix to the nearest 0.5 yd³).
Use the Order tab for a supplier call sheet and the Assumptions panel for the exact factors applied to this run.
Estimate labor hours by dividing quantity by a production rate (units per hour), then apply crew rates.
Historical job-cost data beats generic rates for bidding.
How many units a crew installs per hour (e.g., sq ft/hour).
Rates should match the crew size assumed in the production number.
First-day productivity is often lower—adjust as needed.
No. Educational estimates only. Verify with a licensed professional and local codes.